At Broadview, we take pride in delivering exceptional results. This page is your chance to explore a diverse range of projects where we’ve put our expertise into action. From complex pipeline construction to innovative engineering solutions, we’re committed to exceeding expectations and making a positive impact. Delve into our case studies and discover how Broadview’s dedication translates to real-world success.
Project: OB-OB Pipeline Linepipe Supply
Client: NAOC (Nigeria Agip Oil Company)
Description: Material Supply – 24” + 18” + 10” Pipeline for N-LNG Phase 3 Gas Supply Project as details.
The following pipelines were supplied:
S/N |
Description |
Thickness (mm) |
Length (metres) |
A1 |
Ø 24” x 65 SAW |
14.3 |
40,045 |
A2 |
Ø 24” x 65 SAW |
15.9 |
6,555 |
A3 |
Ø 24” x 65 SAW |
19.1 |
3,000 |
B1 |
Ø 18” x 65 SAW |
11.9 |
37,314 |
B2 |
Ø 18” x 65 SAW |
14.3 |
2,992 |
B3 |
Ø 18” x 65 SAW |
15.9 |
500 |
C1 |
Ø 10” x 65 SMLS |
12.7 |
40,306 |
C2 |
Ø 10” x 65 SMLS |
14.3 |
500 |
D1 |
Ø 24” x 60 SAW |
11.9 |
53,164 |
D2 |
Ø 24” x 60 SAW |
17.5 |
11,393 |
D3 |
Ø 24” x 60 SAW |
17.5 |
120(uncoated) |
D4 |
Ø 24” x 60 SAW |
20.62 |
120(uncoated) |
|
|
|
|
Delivered in 23 weeks
Value: USD 24,924,208.19
Status – Completed
Project: Idu Pipeline Line Pipe Supply
Client: NAOC (Nigerian Agip Oil Company)
Description: Material Supply – 18” SAW Pipeline for Idu Field Gas Development Project:
Description | Thickness | Length |
Ø 18” x 52 SAW | 11.9(Coated) | 22,580m |
Ø 18” x 52 SAW | 15.9(Coated) | 1,020m |
Delivered in 4 months.
Value: USD 3,582,513.00
Status – Completed
Project: Eggs II Linepipe Supply
Client: SPDC (Shell Petroleum Development Company)
Description:
Material Supply – Pipeline
The total of the Eastern Gas Gathering System Phase ll (EGGS ll) Project consists of 58.945km (58945 metres) of 40” Line Pipe and fifteen Hot Induction bends and note that the total length of 58.945km does not include the bends.
Linepipe delivered in 30 weeks.
Hot Induction bends delivered in 44 weeks.
Value: USD 43,171,017.00
Status: Completed
Project: Material Supply – LSAW (Large Saw) Pipe
Client: SPDC (Shell Petroleum Development Company)
Description:
Metallic pipe |
|
Mat |
CARBON STEEL |
Mat, spec |
API SPEC SL GRADE X65 |
Dimensional spec |
ISO 3183 |
Manufacturing process |
LSAW |
Inspection, certif |
BS EN 10204 3.2 |
Diameter, od |
610 mm |
Thickness, wall |
11.61 mm |
Mass |
171.46 kg/m |
Size |
DN 600 |
Product spec level (psl) |
2 |
Total Length – 6,500m
Status – Completed
Metallic pipe | |
Mat |
CARBON STEEL |
Mat, spec |
API SPEC SL GRADE X65 |
Dimensional spec |
ISO 3183 |
Manufacturing process |
LSAW |
Inspection, certif |
BS EN 10204 3.2 ISO 10474 -3.lB |
Diameter, od |
762 mm |
Thickness, wall |
11. 97 mm |
Mass |
220.12 kg/m |
Size |
DN 750 |
Product spec level (psl) |
2 |
Total Length – 37,000m
Status – Completed
Total Value: – USD 13,792,155.00
NGN 1,434,375,185.00
Project: Provision of Engineering Design Services
Client: SPDC (Shell Petroleum Development Company)
Description:
ENGINEERING DESIGN SERVICES
- Engineering Studies carried out such as Capacity Studies, Integrity Assessment, Facilities Design and Operating Envelopes, Facilities Debottlenecking, Power Management Studies etc.
- FEED: Defined the selected concept, and completed enough engineering detail (Basic Design & Engineering Package – BDEP) to price the work (i.e. provided the complete technical scope of work for bid document).
- DED: Further defined the BDEP with enough detail to proceed to execution with exceptions to vendor
- Project and business support services including estimating, cost engineering, planning, quality management and related project services activities to support design works.
- Developed Contract Scope of Work, Technical Specifications and Material Take-Offs as required by the COMPANY for the purpose of issuing Invitations to Tender (ITT) to Engineering Design Contractors for Detailed Engineering Design or Fabrication and Installation/Construction Contractors or EPC Contractors.
- Implemented training programmes to develop skills and competencies in FEED (Front End Engineering Design) and DED (Detailed Engineering Design).
- AutoCAD, 3-D Draughting and PDMS modelling of existing facilities, modification works and new designs.
- Real time 3-D image capture by laser scanning of brownfield facilities.
- Minor modification design services on existing facilities.
- Provision of Data and Document Control services.
Status: Completed
Project: Rehabilitation of Port Harcourt Refinery – Laser Scanning Associated Services
Client: PHRC (Port Harcourt Refinery Company Limited) / Tecnimont
Description:
3D Laser Scanning Service of the following:
- 4 Process areas
- The Storage Tanks (Spherical & cylindrical)
- The Export Pipelines (From Plant to the Jetty and within the refinery complex)
- Technical and Non-Technical buildings
- Power Plant and Utilities
- The jetty complex
Status: Completed
Project: Rehabilitation of Port Harcourt Refinery – Procurement Services / Tecnimont
Client: PHRC (Port Harcourt Refinery Company Limited) / Tecnimont
Description:
The following was procured for the client: bolts, valves, cast, bronze and iron valves, flanges, fitting wrought, discs and rings, gasket, pipes and instrument cables.
Status: Completed